613 656 443WhatsAppoficina@retiradauralitamalaga.euProvince of Málaga

Experiences & best practice

The best and worst ways to deal with old uralita

Old uralita turns up everywhere on older properties in the provincia de Málaga: on garages, porches, chicken sheds, as a tank on the roof or as a pile of spare sheets behind the house. What owners do next ranges from sensible to genuinely harmful. Here is the ranking, from worst to best.

Updated: 29/10/2026

In short

The worst ways to deal with old uralita are breaking or cutting it, pressure-washing it, throwing it into a general skip, burying or dumping it, and reusing it elsewhere. The best ways are leaving sound material undisturbed and monitored, planning a removal by a RERA-registered company before any works, grouping all asbestos elements into one job, and keeping the hazardous-waste documents.

During: the same house partly demolished, brick and timber sorted into separate piles
During: the same house partly demolished, brick and timber sorted into separate piles

Why the method matters more than the material

Asbestos cement is at its least problematic when it is whole and left alone. Almost every bad outcome starts with a well-meant action that breaks, abrades or scatters it. That is why the ranking below is about behaviour, not about the sheets themselves.

The reference point for "doing it right" is simple: under Real Decreto 847/2026, removal belongs to RERA-registered companies working under a plan de trabajo approved by the provincial labour authority, and the waste goes, unmixed, to an authorised manager.

The worst: breaking, cutting and grinding

The most harmful thing you can do with asbestos cement is to turn it into dust. That happens when sheets are smashed with a hammer to fit in a trailer, cut with an angle grinder to shorten them, or drilled to fix something new. Each action creates fragments and fine particles exactly where people are working.

It is surprisingly common in renovations: a builder needs a gap for a new window and cuts through an old fibre-cement panel without a second thought. If you are about to renovate, make sure everyone knows where the asbestos elements are, and have them removed first. Hidden asbestos in interiors is a topic of its own, covered by Demolición Interior Málaga in where asbestos appears in interior renovations.

Also bad: pressure-washing, walking on it, painting over moss

  • Pressure-washing strips the surface of the sheets and sends residue into gutters, gardens and pools. It is often done to "freshen up" a roof before a sale.
  • Walking on the roof risks a fall through the sheets and cracks them even when nobody falls.
  • Painting over moss and dirt after scrubbing combines abrasion with a cosmetic finish that hides the problem from the next owner.
  • Patching with offcuts of other old sheets, usually cut to size on site.

All four have something in common: they disturb the material without any of the controls a registered company would use.

The worst for the waste: skips, burial and dumping

Asbestos cement is hazardous waste 17 06 05*, and Ley 7/2022 (art. 30.1) states that asbestos must be handled safely and never mixed with other waste. The worst disposal habits break that rule directly:

HabitWhat is wrong with it
Sheets in the builders' skipMixes hazardous waste with ordinary rubble and contaminates the load
Burying them on the plotThe asbestos stays on the property and resurfaces with the next excavation
Leaving them in the countrysideIllegal dumping, with the material exposed to weather and people
Stacking them behind the house "for later"Sheets weather, crack and get moved by whoever clears the plot
Reusing them on another shedMoves the problem and involves cutting and drilling

The good: leave sound material alone and monitor it

If the uralita is intact, firmly fixed and nobody plans to touch it, the most sensible short-term option can be to do nothing to the material itself – but to manage it. That means checking its condition from a safe position every so often and after storms, telling gardeners, pool technicians and builders where it is, and noting it in the information you give a property manager or a future buyer.

Our post on whether it is worth removing uralita in good condition explains when that kind of monitoring is enough and when it stops being so.

The best: planned removal by a RERA-registered company

The best way to deal with old uralita for good is a planned removal: a RERA-registered company prepares and files the plan de trabajo, wets the material, takes out the fixings, lowers whole sheets, wraps them, and transports them separately to an authorised manager. You receive the waste delivery documents.

Two habits make that approach even better:

  1. Group every asbestos element into one job. Roof, tank, downpipes, flue and that pile of old sheets behind the shed can all be dealt with in the same planned intervention. See asbestos pipes and tanks for the smaller elements.
  2. Plan it before other works, so that no one is tempted to cut through it in the middle of a renovation.

On our jobs, the asbestos removal is executed by a RERA-registered company that works as our subcontractor; we coordinate the rest of the demolition, the ordinary rubble and the new roof or the clearance of the plot. The details are on our uralita removal and uralita roof removal pages.

What to do if you find uralita after buying

Many owners only discover old fibre-cement after the purchase: a tank in the loft, a downpipe hidden behind a bougainvillea, sheets used as a makeshift roof on the barbecue area, or a pile left by the previous owner in a corner of the plot. The reflex is to "tidy up" before the first summer. That is exactly the moment to pause.

Make a list of everything you have found, photograph it without moving it, and keep children, pets and gardeners away from loose pieces. Then ask for one quote that covers all of it. If the plot also needs clearing after a demolition, the asbestos goes first and the rest follows; Demolición de Piscinas Costa del Sol explains the clearance side on its plot clearance page.

A quick ranking to keep

  1. Best: planned removal by a RERA-registered company, all elements together, documents kept.
  2. Good: sound material left undisturbed, monitored and clearly communicated to anyone working on the property.
  3. Risky: encapsulation done without professional assessment – compare it properly in encapsulate or remove an asbestos roof.
  4. Bad: pressure-washing, walking on it, patching, painting over.
  5. Worst: breaking, cutting or grinding, and getting rid of it in a skip, a hole or the countryside.

If you recognise one of the bad habits in work already done on your property, the sensible next step is to stop further disturbance and ask a registered company to assess what is left.

Sources

Frequently asked questions

What is the worst thing to do with old uralita?

Breaking, cutting or grinding it, because that turns asbestos cement into fragments and dust where people are working.

Can I pressure-wash an old uralita roof?

No. Pressure-washing erodes the surface and spreads residue into gutters, the garden and even the pool.

Can old uralita sheets go in a builders' skip?

No. Asbestos cement is hazardous waste (17 06 05*) and may not be mixed with other waste.

Can I bury old sheets somewhere on my land?

No. Burial is not a disposal route; the material must go to an authorised manager.

What should I do with a stack of spare uralita sheets behind my house?

Leave them undisturbed and include them in a planned removal by a RERA-registered company, together with any other asbestos elements.

Is it acceptable to reuse old uralita on another shed?

No. It moves the asbestos, usually involves cutting and drilling, and only postpones the problem.

Is doing nothing ever a good option?

For intact, firmly fixed material that nobody will touch, monitoring can be a reasonable short-term choice, provided everyone working on the property knows it is there.

Why group all asbestos elements into one job?

Each intervention needs a work plan and a hazardous-waste route; doing roof, tank and pipes together is more efficient.

A builder already cut through a fibre-cement panel. What now?

Stop further work in that area, avoid sweeping up the debris yourself and ask a RERA-registered company to assess and remove what is left.

Who removes the asbestos on your jobs?

A RERA-registered company working as our subcontractor, under its own approved work plan; we coordinate the rest of the job.

Got uralita on your property in Málaga?

Send a few photos and the address – in English or Spanish – and we will tell you how the job would be organised, with no obligation.